Inox Vietnam Manufacturing and Trading Co., Ltd. respectfully announces to our Valued Customers and Partners the establishment of Duc Hoa Ho Chi Minh Factory, marking an important milestone in our strategy to expand production scale, enhance processing capacity, and optimize the nationwide supply chain.
The investment in building a new factory in the southern region demonstrates Inox Vietnam’s long-term commitment to applying modern technologies in manufacturing, better meeting the market’s increasing demands for quality, delivery schedules, and cost efficiency.

1. Duc Hoa Ho Chi Minh Factory Information
• Registered Business Name: Duc Hoa Factory – Branch of Inox Vietnam Manufacturing and Trading Co., Ltd.
• Factory Name: Duc Hoa Ho Chi Minh Factory
• Tax Code: 0106136963 – 003
• Address: Lots Q7A–Q8, Road No. 7, Hai Son Industrial Park (Phase 3+4 Expansion), Duc Hoa Commune, Tay Ninh Province, Vietnam
• Contact Email: info@inoxvietnam.com
2. Scale – Capacity – Operational Capabilities
Duc Hoa Ho Chi Minh Factory is fully invested with modern machinery, production lines, and equipment, capable of meeting high-level technical stainless steel processing requirements:
• Automatic Slitting Line
• Slitting thickness: from 0.25mm to 3.5mm
• Strip width: from 13mm to 1600mm
• Simultaneous double-side protective film application
• Automatic Sheet Cutting Line
• Cutting thickness: from 0.3mm to 6.0mm
• Sheet width: up to 1600mm
• Sheet length: from 300mm to 9000mm
• Double-side film application, air-blowing system to prevent surface scratches
• Paper flatness electrostatic treatment on sheet surfaces
• Industrial & Civil CNC Press Brake Systems
• Continuous gutter bending up to 12 meters without welding joints
• Bending thickness up to 12mm
• CNC Laser Cutting Systems
• Nitrogen and compressed air cutting
• Cutting thickness up to 50mm
• Auxiliary Machinery & High-Standard Materials
• Manual cutters, pipe rolling machines, hopper rolling machines, etc.
• PVC, PE, and laser-grade PVC films imported from Germany and joint ventures with Korea, with full CO/CQ
• Customized auxiliary materials ensuring product quality, occupational safety, and environmental protection
3. Construction & Operation Timeline
• Construction – installation – trial operation: 06 months, starting from January 2026
• Official operation: July 2026
4. Commitment from Inox Vietnam
With the establishment of Duc Hoa Ho Chi Minh Factory, Inox Vietnam reaffirms its orientation toward systematic investment, sustainable development, and quality-centric operations. We are committed to delivering to our customers and partners:
• Products with high value in quality, cost efficiency, technical performance, and aesthetics
• Stable supply capacity capable of meeting large-scale orders
• Contributions to enhancing the position of Vietnam’s stainless steel industry in both domestic and international markets
Inox Vietnam sincerely appreciates the trust, partnership, and continued support of our valued customers and partners over the years.
Respectfully announced.

